17 NCAC 04C .2005 MATERIAL CHANGES TO CERTIFICATION
(a) Pursuant to G.S. 143B-245.11(e), certifying manufacturers shall notify the Department of any material change to the certification. A material change is any change in the criteria found under G.S. 143B-245.11(a), G.S. 143B-245.11(c), or a change as described in G.S.143B-245.11(e). Certifying manufacturers shall electronically submit the changes to the Department through their original initial certification application. There is no fee to update a certification. Certifying manufacturers shall notify the Department not more than 30 days after any material change to the certification.
(b) Failure to notify the Department of a material change to a certification may result in removal of the certifying manufacturer or its vapor products or consumable products from the directory.
History Note: Authority G.S. 143B-245.11; 143B-245.12; 143B-245.16;
Eff. March 1, 2025.